1. Avoid moisture when installing, and lay it with light. In order to prolong the service life, the paving site should be kept away from the water source as much as possible to avoid the humid environment. Toilets, bathrooms, etc. should not be paved. Bamboo flooring. It is best to unpack the bamboo floor in the field one week or two months before the paving, so that the bamboo floor is consistent with the humidity of the construction site before installation, which can effectively control the expansion coefficient after paving.
2, to maintain indoor dry humidity, try to avoid water accumulation on the floor, if you open the heating in winter, indoors can be adjusted by different methods such as using a humidifier or heating on the basin.
3, in order to avoid damage to the paint film on the surface of the bamboo floor, should avoid hard objects, sharp scratches, metal friction, etc., can not clean the floor with a rag soaked in alkaline water or soapy water.
4. In the process of daily cleaning the floor, you can clean the floor with a clean broom, then drag it with a wringed mop. If conditions permit, floor wax can be used once every two to three months, so that the maintenance effect is better.
STRUCTURE
4)Operation controlling system : Most of screen printer controlled by micro-computer built in to make machine stability and easy to operate. When testing, only press simple action key and when starting automatic key to begin printing will be helpful to operate screen printer.
MAINLY FACTOR
Screen Printing Machine,Automatic Screen Printing Machine,Automatic Screen Printer,Bucket Pneumatic Screen Printing Machine,Fabric Screen Printing Machine
KC Printing Machine (Group) Limited , http://www.kcautopm.com