The basic steps of the decoration process

With the rapid development of society, people not only have functional requirements for space, but also have higher requirements for beauty. The role of decoration projects is to make appropriate modifications and adjustments according to the existing space to make it more functional and aesthetic. . So what is the flow of the decoration project? I believe most people will feel very confused. The following is a small editor to explain the flow of decoration.

Decoration project-preliminary design

Decoration design is the "soul link" of home improvement. If you design yourself, it is recommended to spend more time thinking. According to your living habits, clarify the area involved in the decoration process and the location of the furniture. If it is a designer, It is recommended to communicate more, which will bring great convenience to later work.

Decoration project-main body dismantling

The main demolition and modification is the first project to be carried out at the construction stage. The main contents include demolition of walls, masonry, shoveling of wall skins, dismantling of heating, replacement of plastic steel windows and so on. The simplest way is to remove unnecessary walls and build a frame.

Decoration project--hydropower renovation

After the main structure is basically dismantled and reformed, the water circuit is rebuilt. The experienced partner door should know that in these two links, the first measurement of the cabinet must also be started, only a rough measurement of the size, the important thing is to look at the location of the range hood socket, whether it will affect the future range hood Installation, whether the position of the water meter is appropriate, and whether the position of the water inlet is convenient for installing the sink in the future. After the waterway renovation is completed, it is better to do the waterproofing of the bathroom. These several processes can be carried out at the same time. Does not affect each other, and can save time.

Decoration project-"Three Brothers

Woodworkers, bricklayers and oilers are the "three brothers" in the construction process. The principle of appearance is who gets dirty first. The order is: wood-tile-oil.

The process and reminder are as follows:

a. The installation of the door stone can be done together with the floor tiles, or after the floor tiles are installed. The installation of the marble window sill is usually done after the window cover is completed. The glue is sealed.

b. The floor drain is the first one to appear in hardware. It must be installed in conjunction with floor tiles, so it should be purchased when you first go to the building materials market to buy building materials.

c. The range hood is the first installation of household appliances. After the kitchen wall and floor tiles are paved, you can consider installing the range hood.

d. After the second bricklayer left, after the kitchen wall and floor tiles are pasted and the range hood is installed, the cabinet can be prepared for the second measurement.

e. Painting the wall "oil engineer's third" is to complete the wall base treatment, paint the topcoat, and paint the furniture for the "woodworking boss".

Decoration project-kitchen and bathroom ceiling

Before the ceiling of the cabinet, you should buy moisture-proof ceiling lamps, exhaust fans, and bathroom heaters. These items need to be left with thread ends and openings after they are installed at the same time.

Decoration project-kitchen cabinet installation

After the ceiling was over, the cabinets started to be installed. The installation can be completed in a normal day. At this time, the sink and gas stove must be installed at the same time. After the gas stove is installed, gas testing is required. Generally, the property will be coordinated to open the gas in advance.

Decoration project-wooden door installation

The wooden door should be measured one month before the installation. The hinges, door locks, floor suction and other hardware accessories that need to be installed at the same time must be prepared in advance. If it is smooth, it can be done in one day.

Decoration project-floor installation

The floor can be installed the day after the wooden door is installed, which is also the time of day. Floor installation needs to pay attention to the following issues:

a. Ground leveling or local leveling is required.

b. The floor of the floor at home should be cleaned and kept dry, and never be cleaned with water.

c. The indoor cutting floor has serious pollution to the wall surface. If conditions permit, the cutting of the floor must be done in the corridor, but it must be cleaned afterwards.

Decoration project--paving wallpaper

Before laying wallpaper, you should try to do "nothing" on the wall. After the house is cleaned up, you can ask for wallpaper laying. If it is smooth, it can be completed in one day.

Decoration project-radiator installation

On the second day after the wallpaper is laid, the friends who replaced the radiator can hang the radiator on the wall.

Decoration project-switch socket

It is necessary to know a detailed understanding or record of the number and location of switches and sockets that need to be installed in each room before installing.

Decoration project-lamp installation

Just install the lamp and install the purchased lamp. Check for damage.

Decoration project-hardware sanitary ware installation

The water pipes, sanitary wares, drying racks, etc. purchased in the building materials market were delivered at this time, and all were installed together. It is no exaggeration to say that when the faucet is turned on, the whole home feels "live" and will feel special happy.

Decoration project-curtain rod installation window

The installation of curtain rods marks the end of home improvement.

Decoration project-pioneering cleaning

Before pioneering cleaning, remember not to install curtains or furniture, and try to be as open as possible to make cleaning more thorough.

Renovation project-furniture entry

Let's purchase or make furniture in advance and arrange it according to location.

Decoration project-home appliances

Arrange and install according to the position like furniture.

Decoration project-furniture accessories

In the final step, you can match some green plants, wall paintings, decorations, etc. according to the overall decoration style. In short, be sure to buy something that matches the entire style.

I have shared the introduction of the decoration project here, and I hope to help you. If you need to know more about decoration, building materials, home furnishing, you can follow this website and share more information with you.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

If you are interested in brand cooperation, content cooperation, and advertising of this website, please send an email to :.

Renovation

Wireless Daylight Lamp

Light Therapy Lamp

Guangdong Jishengke Industrial Co.,Ltd , https://www.jskpads.com